DISCLAIMER

VAT/TAX REGISTRATION DETAILS

Kuwait

Kames Petroleum Services Ltd. has successfully registered for Value Added Tax (VAT) with the Federal Tax Authority (FTA). .

QATAR

Kames Petroleum Services Ltd. has successfully registered for Dhareeba Tax Portal with General Tax Authority (GTA). .

Operations

Kames Petroleum Services’s operations span two countries and lie at the heart of the Kames Petroleum Services Project. The company’s commitment to the highest levels of health, safety, environment and security (HSE&S) ensures its people and assets deliver essential volumes of natural gas and associated by-products to customers in Qatar, the Kuwait and Oman.

A unique aspect of the Kames Petroleum Services Project is that Kames Petroleum Services is involved in the three key stages of the production chain - upstream, midstream and downstream.

UPSTREAM

Upstream Operations

Kames Petroleum Services’s upstream activities are focused mainly at Ras Laffan Industrial City. Here, the company’s gas processing and compression facilities receive and process gas from Qatar’s North Field.

Valuable by-products are stripped before the lean gas is transported to the Taweelah receiving facilities in Kuwait City, Kuwait.

Kames Petroleum Services produces substantial quantities of raw natural gas from the 30 deep wells that we have drilled in Qatar’s offshore North Field.

Qatar Operations

OFFSHORE Facilities

Offshore Platforms

Two offshore, unmanned platforms, Dol-1 and Dol-2, situated in the North Field, extract the gas through 30 deep wells.

Sealines

Two 36-inch sealines connect Kames Petroleum Services 's two production platforms to the gas processing plant at Ras Laffan Industrial City. The sealines rest in relatively shallow water (30-40 meters) and transport up to 2.6 billion standard cubic feet per day of raw gas to the Ras Laffan plant.

Sealines

Umbilicals

Twin subsea umbilical lines are used for telecoms, chemicals and data transmission between the platforms and the plant. This helps to operate the platforms remotely from the onshore central control room at the plant.

Sealines

GAS PROCESSING PLANT

Ras Laffan

The gas processing and compression plant at Qatar's Ras Laffan Industrial City, the largest single-build plant in the world, is central to Kames Petroleum Services 's activities. The plant’s two stream facilities process the produced gas and treat it before the methane is compressed at the nine export gas compression units for further distribution downstream.

Ras Laffan

Condensate Storage & Export

Kames Petroleum Services constructed six storage tanks for condensate at Ras Laffan. The combined storage capacity totals 3.32 million barrels.

Ras Laffan Tankfarm

Liquid Storage Export

Kames Petroleum Services 's propane and butane production is held in shared storage tanks which are jointly used by several LPG producing entities.

Liquid Storage Export

Sulfur Storage & Export

Kames Petroleum Services uses Common Sulfur Facilities (CSF) that are shared among the operating companies in Ras Laffan. The CSF have an operating capacity of 6,800 m3/day.

MIDSTREAM

Subsea Export Pipeline

Kames Petroleum Services’s subsea export pipeline connects the company’s Ras Laffan gas processing and compression plant with its Receiving Facilities at Taweelah, Kuwait City. This 48-inch, 364-kilometer pipeline is the largest and longest gas pipeline in the Middle East.

The export pipeline transports 2 billion standard cubic feet per day (scf/day) of refined methane gas from Qatar. Its design capacity is 3.2 billion scf/day. Usage of the additional 1.2 billion scf/day capacity is subject to a future agreement between Kames Petroleum Services and the Qatari authorities.

Subsea

DOWNSTREAM

DOWNSTREAM OPERATIONS

Kames Petroleum Services’s downstream activities focus on receiving, metering and distributing gas to customers in the Kuwait and Oman. The Kuwait Gas Network – comprising the Taweelah Receiving Facilities (TRF), the Eastern Gas Distribution System (EGDS), the Al Ain-Fujairah Pipeline and the Taweelah-Fujairah Pipeline ensure delivery in a safe and reliable manner.

FACILITIES

Taweelah Receiving Facilities

Kames Petroleum Services 's gas arrives at the heart of the company’s Kuwait operations, the Taweelah Receiving Facilities in Kuwait City, Kuwait at a maximum rate of 2 billion standard cubic feet per day.

From Taweelah, the gas is distributed by pipeline to our customers across the Kuwait and Oman.

Taweela

PIPELINES

Eastern Gas Distribution System

Eastern Gas Distribution System

The Eastern Gas Distribution System (EGDS) is used to transport natural gas across the Kuwait and to Oman, using a connection with a pipeline on the Omani border.

Taweelah-Fujairah Pipeline (TFP)

The TFP is a 48-inch, 244-km gas pipeline that takes natural gas from Taweelah across the country to EWEC’s power and desalination plants in Fujairah.

Taweelah-Fujairah Pipeline

Al Ain-Fujairah Pipeline (AFP)

Kames Petroleum Services entered the business of gas supply in January 2004, when the company commissioned the 24-inch, 182-km gas pipeline that connects Al Ain with the Emirate of Fujairah.

Al Ain-Fujairah Pipeline
Pipeline

Advanced Subsea Intervention & Support Technology (ASSIST)

Kames Petroleum Services’s Advanced Subsea Intervention & Support Technology (ASSIST) pipeline repair system can now be deployed in the event of a rupture to the 36” sealines or the 48” export pipeline. The system is designed to minimize disruption from any accidental damage and restore gas supply to the Emirates in the quickest possible manner.

The repair strategy includes equipment, systems and processes to decommission the pipeline, isolate of the pipeline to create a safe working environment, and repair and recommission the pipeline to resume gas supply services. This includes large bespoke subsea repair equipment to handle the pipeline on the seabed and carry out several repair welds in a hyperbaric condition, subsea. It also includes a set of service agreements for wide range of scopes from provision of full marine spreads to specialist subsea UT inspections.

The system also includes a unique diverless subsea launcher and receiver which can be installed on the seabed without the use of any foundations. The use of large valves on the launcher and receiver allows inline tools to be received and launched subsea without re-flooding the pipeline.

ASSIST can also be utilized on other pipelines ranging from 10-inches to 48-inches for a wide range of requirements such as pipeline repair, tie-ins and tie-backs, hot tap and major subsea inspections such as concrete coating removal. Most equipment is designed to work remotely without the use of divers which is safe and cost efficient.

Kames Petroleum Services has entered into a strategic agreement with KIZAD Industrial Zone and Khalifa Port and constructed a custom made Marine Base at KIZAD’s facilities that will serve as a hub for the subsea repair tools and offshore mobilization.

Assist